QFD 23.03.230810.2
Release Notes
Category | Summary | Description | Labels | Acceptance Criteria | Release Notes | Documentation Link | Story ID |
---|---|---|---|---|---|---|---|
Fix | ATO and Assignment Groups (BugFix Retro) |
ATO claims are setting ClaimType to Card which is not a valid value defined on the ClaimType property. |
|
Resolved a issue preventing ATO claims to be worked/segmented using assignment groups. |
QPS-9274 | ||
Compatibility | Make ARIA count class, refactor @baseclass count property |
the @baseclass.count property introduce by the support business event hosed some cases in prod. We need to refactor this to not be in baseclass or to be named something really unique so it won't cause conflicts with other count properties. |
[Business_Events] |
|
Defined new properties in support of generating business events for ARIA actions. |
QPS-9247 | |
Fix | Reg E Withdrawal- PC Reversal Date Default |
As a system, when a Reg E dispute is withdrawn and the user not configured to perform the reversal of a provisional credit on the same date as the withdrawal the defaulted debit, I should calculate the PC reversal date as 5 business days + 1 calendar day to ensure the regulatory requirement for 5 full business days of draft coverage is complied with. |
[Regulatory] |
|
Updated the Deny Debit Date calculation to ensure accountholders have full use of funds for 5 full business days as required by Regulation E. The new calculation counts the denial date as day 0 and the deny debit date will be set to 5 business days+1 calendar day to ensure provisional credit is not debited before the end of the 5th business day. |
QPS-9245 | |
Enhancement | Remove ARIA Results from Selected Tansactions |
ARIA results take up a lot of memory. QPS-8888 removed the data from the main claim object, however it still remains on the SelectedTransactionList. We need to make sure that any time a claim is opened, that the ARIA details are removed from the SelectedTransactionList |
|
Optimized the storage of ARIA result data to improve application performance. |
QPS-9234 | ||
Fix | Reg E - PC Reversal Date Default |
As a system, when a claim is denied and the Deny Debit date is set the denial action should be counted as day 0. If a claim requires a reg e deny debit date of at least 5 business day, the reg E calculation will be 5 full business days + 1 calendar day to ensure the account holder has the funds for a full 5 business days. |
|
Updated the Deny Debit Date calculation to ensure accountholders have full use of funds until the regulatory protected 5 business days. The new calculation counts the denial date as day 0 and the deny debit date will be set to 5business days+1 calendar day to ensure provisional credit is not debited before the end of the 5th business day. |
QPS-9160 | ||
Fix | Block and Reissue Failures for JH Symitar |
Cards are not successfully blocked via JH Symitar. |
[Symitar] |
|
Resolved an issue where cards were not successfully blocked and reissued via the Jack Henry Symitar service. |
QPS-9158 | |
Enhancement | ARIA - Data Storage |
As a system, the ARIA data should be saved outside of the work object and in the Investigation tab. |
|
Moved ARIA data results to the Investigation Tab instead of being stored to the work object. |
QPS-8888 | ||
Fix | Case Status Widget: PC Doc Satisfied Date Issue |
Summary: Whenever a statement of fraud or statement of dispute is required in order to grant pc, at the time that the document is received/processed, the PC Doc Requirement Satisfied Date/Time property should be set to reflect the current date/time. This is not happening when the document requirement is being met via an upload from the status widget. |
|
Resolved an issue where when a regulatory document is required in order to grant provisional credit and the required document is uploaded via the External Case Status Widget the document dependency was not updated. This fix ensures that documents uploaded through the External Case Status Widget update the PC Doc Requirement Satisfied Date/Time property. |
QPS-8528 | ||
Fix | Duplicate Credits on Account |
As a system, when the reg resolution date is reached any PC review assignment should be removed. |
|
When a cases reaches the provisional credit SLA deadline and provisional credit is issued by the reg; the assignment should be moved ahead in the workflow. The change below resolves an issue where the provisional credit review assignment was not resolved at regulatory deadline and the users had the ability to still grant PC even though the provisional credit was already systematically granted. This fix ensures if PC is granted by the system, the option to grant PC is not available in the remaining assignment or from the Other Actions menu. |
QPS-8380 | ||
Enhancement | Dispute Regulatory Protection Activity |
As an analyst, I should have field on the Dispute table that reflects when regulatory protection was enforced. |
[Business_Events] |
|
This simple event is useful for real-time tracking and reporting of disputes that are automatically resolved by the system due to a regulatory deadline approaching. |
QPS-8339 | |
Enhancement | Monitoring Average Counts (Business Monitoring) (Dev Only) |
The below average should be added to the business monitoring section of the QSR dashboard  Average number of accounting processed by accounting rule name. Average number of accounting executed by accounting rule name. Average number of accounting executed by execution method (e.g. AUTO vs Tracking Only). Average number of letters sent by purpose. Average number of recovery actions processed by action name |
|
Adding of business related monitoring details to the snowflake dashboard |
QPS-8195 | ||
Fix | Denial Not Approved Prior to Reg 10 |
As a system, when a claim is in PC Review and a user attempts to deny the claim, but the claim is routed to approval, if the denial approval was completed before Reg 10, Provisional Credit should be granted. |
|
Resolved an issue where when a user did not issue PC on a claim and attempted to deny the claim PC Review which required a deny approval, if the deny approval was not processed by Reg day 10, PC was not granted on the claim. This fix ensures PC will be granted by Reg day 10 if the deny approval was not yet processed. |
QPS-7786 |